The terrible structural work that has been the hold up of everything in the last month!!!!
This white box used to be a window into the next apartment in the D line
The 2*4 were put up because our contractors were a little worried about a structural joist being supported by a door frame, which is not a load bearing wall!!!!!
No comments:
Post a Comment